Solar farm leads, UK: approved projects weekly
The solar farms that now have a date to build by.
A solar farm needs two things before it can be built: planning approval and a date to connect. Either on its own is a hope. Both together, with a company behind them that has done it before, is a project that will be procured within the year.
PA/2026/1178written for equipment and epc
38 MW solar farm approved with a 2027 connection date
- Planning approval granted 10 September 2026 for 38 MW.
- The connection date is firm for the second quarter of 2027.
- Held by a project company whose parent owns four operating solar farms.
- Co-located storage is referred to but not yet approved.
Approval and a firm connection date in the same month, behind a parent that already runs four sites. Construction is next year's, and the storage beside it may be a second project for the same buyer.
- What puts a card here
- A solar project gains its planning approval or its firm connection date.
- When the money moves
- Construction usually starts within twelve months of both being in place.
- You sell
- storage and solar EPC, switchgear, transformers, main plant