Industrial project leads for equipment suppliers

Industrial sites that have just been allowed to do more.

A factory, a treatment works or a waste site cannot increase what it handles on a whim. It needs permission first, and the permission says how much, of what, from when. Each one is the start of a design stage in which equipment, monitoring and site works are chosen, and almost none of it is ever put out to public tender.

Start your free month3 categories, one month, a work email
PR/QR3310ST/V002written for every supplier to the site

Food factory cleared to process a fifth more

  • Permitted throughput rises by 20% at an existing site.
  • The variation adds a new effluent limit and a monitoring condition.
  • Granted 10 September 2026.
  • The group holds three other permitted sites in England.

More production, a tighter effluent limit and a new duty to measure, all at once. Treatment plant, a laboratory and a site contractor each have a reason to call, and the group has three more sites like it.

What puts a card here
A site is cleared to open, to raise its capacity or to take a new material.
When the money moves
Design and procurement usually run six to eighteen months after the grant.

Three things the card tells you that a list cannot.

The permission is the start of it. What makes the call worth making is what the other records say about the company holding it, 13 of them read together.

  1. The capacity before and after in the units equipment is sold in: tonnes a year, cubic metres a day.
  2. Whether the change needs new plant or only more of the same, which tells you whether there is a design stage to join.
  3. Who owns the site and whether the group has done the same at its other sites, which tells you whether this buyer will be back.

Who reads this one.

  • Water and effluent treatment
  • Waste and recycling processing plant
  • Environmental laboratories and consultants
  • Site infrastructure and fire safety
  • Process engineering contractors

Questions about this one.

Is this the same as construction project leads?
No, and that is the point of it. Construction databases follow planning applications for new buildings. Many of the changes here need no building work at all — more throughput, a new material, a tighter limit — so they never appear in a construction feed.
Which sectors does it cover?
Food and drink, waste and recycling, chemicals, water and effluent treatment, and anything else that needs an environmental permit to operate. The card says which sector and what changed.