New waste sites UK: leads for plant suppliers
The waste sites that have just been allowed to take more.
A recycler cannot start shredding a new material, or double what it takes through the gate, until its permit says it may. The permit names the material, the tonnes and the operations, which is very nearly a specification for the plant that has to be bought.
PR/GH4521KL/V003written for process and treatment plant
Recycler cleared to take plastic film at an existing yard
- Permitted tonnage rises from 30,000 to 55,000 tonnes a year.
- Plastic film and packaging added to the accepted materials.
- Shredding and baling added to the permitted operations.
- Varied 12 September 2026.
Twenty-five thousand more tonnes of a material the yard has never handled, and two operations it has never run. The shredder and the baler are not optional, and nothing has been bought yet.
- What puts a card here
- A waste or recycling site is permitted to open, to raise its tonnage or to take a new material.
- When the money moves
- Plant for a new material is usually bought before the material can be accepted.
- You sell
- effluent and water treatment, pumps and tanks, processing and abatement plant