New waste transfer site applies to open
- First permit applied for 11 September 2026, for 74,000 tonnes a year.
- Conditions require impermeable surfacing with sealed drainage.
- A fire prevention plan is required before waste is accepted.
- The operator holds no other permitted site.
Surfacing, sealed drainage and fire detection all required before the first load, at an operator doing this for the first time and with no established supplier for any of it.
An invented example of the shape of a card. See a real one, opened.