A site that is going to treat more, discharge more or meet a tighter limit has to be given permission first, in writing, with numbers. Between that permission and the first order there is a design stage, and it is the only point at which a supplier can be specified rather than priced against two others.
PR/AB1234CD/V004written for process and treatment plant
Dairy site cleared to treat a third more effluent
- Permitted discharge rises from 450 to 600 cubic metres a day.
- Varied 9 September 2026; the new limit takes effect on grant.
- No treatment technology named in the variation.
- The site belongs to a group that varied two other sites this year.
150 cubic metres a day of new treatment capacity with nothing specified yet, at a group that is doing this repeatedly. The specification is open, and the same buyer will be back.
- What puts a card here
- A site is cleared to discharge more, to treat more or to meet a tighter limit.
- When the money moves
- Design and procurement usually run six to eighteen months.