Waste site leads: weighbridges, fire, drainage
The sites that have to be built before they can open.
A permission to operate is also a list of things that have to exist on site before operating can start: hardstanding, drainage, a weighbridge, fire detection, a wheel wash. None of it is optional, and all of it is bought in the weeks after the grant.
PR/CD5678EF/A001written for site infrastructure
New waste transfer site cleared to open
- First permission granted 11 September 2026 for 74,000 tonnes a year.
- Conditions require impermeable surfacing with sealed drainage.
- A fire prevention plan is required before waste is accepted.
- The operator holds no other permitted site.
Surfacing, sealed drainage and fire detection all required before the first load, at an operator doing this for the first time and with no established supplier for any of it.
- What puts a card here
- A site is cleared to operate for the first time, or to take a material that changes what it needs.
- When the money moves
- The works have to be complete before the site may operate.
- You sell
- weighbridges, fire detection, hardstanding, drainage, site services